Synchronization problem

Pioneer
Pioneer

Hello

 

I made small program to try sync manager in NX11.

I used SIM_15 machine, created two tools one for lower turret and one for B head.

Tools has different channels.

When I try to run Synchronization it gives following errors:

Postprocessing for Synchronization  Cannot open file

XTP_generate_trans failed

Failed to initialize Synchronization manager

 

I tryed Sim15 example and it work, but i dont find anything I have done differently that in sim15 example.

 

Can someone point out exact steps that needs to be done in dual channel machine synchronization  to get it work.

 

2 REPLIES

Re: Synchronization problem

Siemens Phenom Siemens Phenom
Siemens Phenom

Hi Jussi,

 

hard to tell from that. Please check if your channel configuration is fully correctly defined.

 

You also may could post the NX logfile, that might help more.

 

Thomas Schulz
Siemens PLM
Manufacturing Engineering Software

Re: Synchronization problem

Pioneer
Pioneer

Hello

 

Thanks for answer.

Just find a problem, it was geometry related.

Post needed to have correct geometry setup.

 

Jussi