Cancel
Showing results for 
Search instead for 
Did you mean: 

ER: Add ability to use multiple assembly load options

Gears Esteemed Contributor Gears Esteemed Contributor
Gears Esteemed Contributor

Below find an ER of mine, if you find it useful, feel free to ask GTAC to be added to ER#7331952.

                            ER Template
                            -----------

Short Description of desired enhancement: <Problem rather than a solution>
    It is not possible to have fallback mechanisms for assembly load options.

What activity in your process is the product not able to currently handle?
    For example, it is not possible to first use load "from folder", if the component is not found use "from search folders", last use "as saved".

What result are you trying to achieve? (Please provide as many details as possible.)
    Being able to load project parts from the location of the assembly part or relative paths to the location of the assembly part
    and standard parts, electrode fixtures, manufacturing fixtures, machine tools, etc. from search folders.

Do you currently have a workaround?
    No

Do you have a proposal for the solution you envision Siemens PLM providing for this capability?
    Replace the load option dropdown with multiple selections for first, second, third, etc.

What is the level of productivity gained from such an enhancement?
    HIGH, easier way to specify locations for standard parts

Other information:
Stefan Pendl, Systemmanager CAx, HAIDLMAIR GmbH
Production: NX10.0.3, VERICUT 8.1, FBM, MRL 3.1.7 | TcUA 10.1 MP7 Patch 0 (10.1.7.0) | TcVis 11.4
Development: C (ITK), .NET, Tcl/Tk Testing: NX12.0 | AWC 3.4 Preparing: NX12.0

Employees of the customers, together we are strong Smiley Wink
How to Get the Most from Your Signature in the Community
NX Customization - Best Practice Guide