Cancel
Showing results for 
Search instead for 
Did you mean: 

NX simulation

Builder
Builder

Dear all,

I have done a 601 analysis. The load increased for .5 seconds and at the final step was 0 (load-unload).

In the final step I still have von Mises stress. Quite important in value, on a small area. Is it correct?

Many thanks

Ionut