Cancel
Showing results for 
Search instead for 
Did you mean: 

Flow control entry strategy

Pioneer
Pioneer

In this simulation I want to use flow control in this way: during 4 seconds the MUs go to line 1 and in the next 4 seconds the MUs go to the line 2 and so on. 

How I write this condition in Method? 

Thanks

1 REPLY

Re: Flow control entry strategy

Solution Partner Valued Contributor Solution Partner Valued Contributor
Solution Partner Valued Contributor

In fact you can't do this with the flow control.

It can only be done by method.

 

Attached and example with all the details.

 

Hope I'm not doing your homework. Smiley Wink

 

cortega@interlatin.com.mx
+52 (81) 10801310
InterLatin S de RL de CV