I am new at Plant Simulation and I have a problem which I assume to be very simple. My assembly station produces 2 output in 1 cycle time (2 outputs in 40 seconds to be exact). How do I model it ? I don't want to set cycle time to 20 seconds per output. I need the visual of getting out 2 outputs from the station. 

Best regards,

Alp 

3 REPLIES

Re: Modeling 2 outputs in 1 cycle time

Phenom
Phenom

After your assembly (really assembly and not disassembly ?)

 

set a flowcontrol object and connect it with 2 successors.

 

set the exit strategy of the flowcontrol to  "to all successors"

Re: Modeling 2 outputs in 1 cycle time

Experimenter
Experimenter
Station takes 2 different inputs, processes them and produces 2 products at 1 cycle.

Flow continues in 1 line afterwards, could I connect 2 successors to 1 point afterwards ?

Thanks for your reply !

Re: Modeling 2 outputs in 1 cycle time

Solution Partner Phenom Solution Partner Phenom
Solution Partner Phenom

Did you consider to use a ParallelProc with capacity 2? I think that should work for you.

 