Showing results for 
Search instead for 
Do you mean 
Reply
Solved! Go to solution

Pick and Place

Hi,

 

I have a production line with several stations. I want to determinate from wich station the Pick and Place gets the MU and where it drops. The sequence should be always the same. How can I do it?

3 REPLIES

Re: Pick and Place

the "basic direction" you set with the help of connectors

 

What kind of sequence you need?


Steffen Bangsow
freelance simulation specialist  
web: www.bangsow.eu
mail: steffen@bangsow.net


Re: Pick and Place

I want the PickandPlace to get the MU from a Source, bring it to a SingleProc1, then get a MU from a SingleProc2 and bring it to a SingleProc3.

Solution
Solution
Accepted by topic author leo1
‎10-10-2016 07:03 AM

Re: Pick and Place

you can use the exit control of Source and SingleProc2 to "address" the MU. You can use the attribute destination to do this. Than you can use the exit strategy "MU attribute" of the PickAndPlace to select the right successor (see help).

Steffen Bangsow
freelance simulation specialist  
web: www.bangsow.eu
mail: steffen@bangsow.net