Showing results for 
Search instead for 
Do you mean 
Reply
This is an open group. Sign in and click the "Join Group" button to become a group member and start posting.
Highlighted
Presentation: Advanced planning and scheduling between Plant Simulation and Preactor
[ Edited ]

Jacob Schillinger of Siemens delivers "Advanced planning and scheduling collaboration between Plant Simulation and  Preactor delivers similar capabilities through different functionalities."

This presentation delivers a short SIEMENS Preactor overview for Plant Simulation experts. Similarities and differences between both planning approaches will be pointed out. In addition possible synergies between material flow simulation and advanced planning and scheduling will be discussed.  You can read, download and share the attached presentation.

 

Plant Simulation User Conference 2017 (63 von 208).jpg

 Plant Simulation User Conference 2017 (65 von 208).png

  Plant Simulation User Conference 2017 (62 von 208).jpg