Are approver names typically entered directly on the cad drawing

Pioneer
Pioneer

What is the general practice for recording who the drawing approvers were?  Are names entered directly onto the SE drawing title block?

1 REPLY

Re: Are approver names typically entered directly on the cad drawing

Esteemed Contributor
Esteemed Contributor

We approve drawings using an Engineering Change Order.  The ECO holds the approver information and the drawings and their specific revisions are listed on it.  The ECO number is recorded on the drawing either in the title block for a new issue or in the rev block for a revision.


Thanks,
Ken

Production: ST9 MP7
Testing: ST10