I'd like to ask for help regarding creating sheet metal part in Sync.

 

How to do it?

 

Please see attached video.

 

Thanks,

Arek

 

(view in My Videos)


Production: SE ST10 MP8
;
4 REPLIES

Betreff: Synchronous Sheet Metal Issue

Gears Esteemed Contributor Gears Esteemed Contributor
Gears Esteemed Contributor

Hi @arekkul

 

 

 

it is exactly what the message says:

 

"Such a flange isnot possible as synchronous feature!"

 

20180322_1224.PNG

 

A sync contourflange needs at least a small plane start and end surface and can not consist of a bended (cylindrical) face only.

 

 

 

So You either can add short linear extensions to the circle

 

20180322_1225.PNG20180322_1227.PNG

 

 

or You switch over to Ordered, where such a contour flange is possible too!

 



regards
Wolfgang

Betreff: Synchronous Sheet Metal Issue

Phenom
Phenom

Hi @hawcad

 

thanks for help.

 

I'm new to Sync hence silly questions.

 

regards,

Arek

 


Production: SE ST10 MP8
;

Betreff: Synchronous Sheet Metal Issue

Gears Phenom Gears Phenom
Gears Phenom
NO silly questions! we ALL learn by seeing new and old perspectives!!!
===================================================
Matt Johnson
Solid Edge Certified Professional (ST7 & ST8)
Solid Edge ST9 (SEEC) - Production
NX11 (Tc Integration) Pre-Production Testing
Teamcenter 10.1.7

Betreff: Synchronous Sheet Metal Issue

Gears Esteemed Contributor Gears Esteemed Contributor
Gears Esteemed Contributor

Hi @arekkul

 

 

 

no silly question at all, per definitionem a silly questions doesn't exist, only foolish answers!

 

Sorry for the late answer, but I was on phone the last half an hour.

 

And there are differences between sync and ordered in reagrd what is possible to do, and how it is possible.

But the Big Bang is, that You can use both methods together as You like and as You need.

I always preach to think about integrated modelling rather than synchronous modelling or ordered modelling.

Use both - thats the message!

Integrated is Sync plus Ordered!

 

 