cancel
Showing results for 
Search instead for 
Did you mean: 

REVISE ALL ITEMS IN BOM?

Pioneer
Pioneer

I have a BOM structure I am viewing in Structure Manager.  Is there a way, OOTB,  I can increment every revision for the items in that BOM?
-Lindy

10 REPLIES

Re: REVISE ALL ITEMS IN BOM?

Esteemed Contributor
Esteemed Contributor

There is a workflow handler for this.

 

AddAllComponents.PNG

Stefan Pendl, Systemmanager CAx, HAIDLMAIR GmbH
Production: NX10.0.3, VERICUT 8.0, FBM, MRL 3.1.4 | TcUA 10.1 MP7 Patch 0 (10.1.7.0) | TcVis 10.1
Development: VB.NET, Tcl/Tk    Testing: NX11.0 EAP, NX12.0 EAP

How to Get the Most from Your Signature in the Community

Re: REVISE ALL ITEMS IN BOM?

Pioneer
Pioneer

I am a novice in the workflow area.  Can you please walk me through high level steps?  e.g. DESIGN=Create X, assign handler.  EXECUTION=Select root/parent of bom assign workflow.

Lindy

Re: REVISE ALL ITEMS IN BOM?

Pioneer
Pioneer

Not seeing that handler you have highlighted.  I am in Tc9.1.  Please advise

Re: REVISE ALL ITEMS IN BOM?

Esteemed Contributor
Esteemed Contributor

The handler was there in Tc 8.3 too, but it might have changed its name in Tc 10.1

You should be able to find it by searching the Tc work-flow handler documentation for "assembly component" as a phrase.

Stefan Pendl, Systemmanager CAx, HAIDLMAIR GmbH
Production: NX10.0.3, VERICUT 8.0, FBM, MRL 3.1.4 | TcUA 10.1 MP7 Patch 0 (10.1.7.0) | TcVis 10.1
Development: VB.NET, Tcl/Tk    Testing: NX11.0 EAP, NX12.0 EAP

How to Get the Most from Your Signature in the Community

Re: REVISE ALL ITEMS IN BOM?

Pioneer
Pioneer
So I found 9.1 equivalent EPM-attach-assembly-components But I am not sure this will take my Root and all of its childrens and attachements and increment to next revision. Part-1 Rev 2 becomes Part-1 Rev 3

Re: REVISE ALL ITEMS IN BOM?

Pioneer
Pioneer

Not sure I understand what increments the revision.  

 

EPM-attach-assembly-components
Attaches all the components of the target assembly as the targets of the same
workflow process. This handler is intended for use only with item revisions.


When a workflow process is initiated for an item revision, this handler derives the
components of the targeted item revision by traversing item revisions attached BOM.

 

So if I understand this right, something still needs to trigger the item revision, this action handler basically allows you to determine what componenets will be revisioned????

How do I revision?


 

Re: REVISE ALL ITEMS IN BOM?

Experimenter
Experimenter

Hi,

 

If you have TC Manufacturing licence, in Manufacturing Process Planner perspective you can revise all parts interactively at once.

 

Hope this helps

 

Fabien

Re: REVISE ALL ITEMS IN BOM?

Esteemed Contributor
Esteemed Contributor

The handler just adds the component revisions to the targets, to revise the targets you need to add a different handler, but I don't know which, since I never needed it.

Stefan Pendl, Systemmanager CAx, HAIDLMAIR GmbH
Production: NX10.0.3, VERICUT 8.0, FBM, MRL 3.1.4 | TcUA 10.1 MP7 Patch 0 (10.1.7.0) | TcVis 10.1
Development: VB.NET, Tcl/Tk    Testing: NX11.0 EAP, NX12.0 EAP

How to Get the Most from Your Signature in the Community

Re: REVISE ALL ITEMS IN BOM?

Pioneer
Pioneer

That would be too easy for me.  LOL
No such luck, but I will mention that as an option.  

Lindy